OurProjects

No Client Scope of Work Value
01 UAE Armed Forces Construction of Runway, Taxiway and Air Craft Apron At Sweihan Air Base 326,812,649.00
02 UAE Armed Forces Construction of New Road, Bridge and Infrastructure Works/ Hatta 119,456,951.00
03 UAE Armed Forces Construction A New Border Center 98,975,156.00
04 Advanced Integrated Systems Earth Works, Excavation, Fill & Compaction, Paving of Gatch Road & Infrastructure, Trenching & Ducting, Lying of Fiber & Electrical cable and Smart Fence JV with Al Sahraa Group 98,900,000.00
05 Advanced Integrated Systems Berimeter Road Fence & Gate Works 78,437,650.00
06 UAE Armed Forces Construction A New Road On North Border (Phase One) 66,377,898.00
07 SCADIA Development Works for Al Bateen Airport (Runway Delethalisation- Cleanup & Grading) and Additional Works 53,000,000.00
08 ACC/ADWIA Strategic Water Storage Recovery Project- Liwa 50,000,000.00
09 Advanced Integrated Systems Construction of Access Road 11kms Fujairah- RAK and Trenching & Decting & Lying of Fiber Optic Cables 350kms at Fujairah & Ras Al Khaima Border Area 48,406,261.00
10 UAE Armed Forces Construction A New Road On North Border (Phase Two) 44,206,469.00
11 Advanced Integrated Systems Security Works & Fencing On Borders (Qiswara Area) 41,719,200.00
12 UAE Armed Forces Construction Road at Jaber Mountain region At RAK 35,857,223.00
13 UAE Armed Forces Construction of Infrastructure Works/ Hatta 27,653,554.00
14 ACC/ (GASCO) Execution of Earthworks, Ruwais 4th NGL Train Project- Abu Dhabi. Jv with Al Sahraa Group 25,000,000.00
15 UAE Armed Forces Construction of Road At Jaber Al Jabel Mountain At Ras Al Khaima 22,500,000.00
16 Advanced Integrated Systems Digging, Excavation, Civil Works, Fencing, Pipeline & Coating (ADCO Area) Jv with Al Sahraa Group 22,000,000.00
17 Al Jaber Energy Supplying of Gatch 19,500,000.00
18 China Petroleum Engineering & Construction Corporation Construction & Road Maintenance 19,406,867.00
19 MW-SO-432-2007 Maintenance of the Status of the Border Fence The Hafeet Virulence and the Border To Mount Manara Center for the Border to the Valley 16,320,000.00
20 Advanced Integrated Systems Earth Works, Excavation, Fill & Compaction, Paving of Gatch Road & Infrastructure, Trenching & Ducting, Lying of Fiber & Electrical cable and Smart Fence 15,500,000.00
21 TAKREER Civil Works 15,000,000.00
22 TAKREER Earth Works & Supply Gatch 15,000,000.00
23 Advanced Integrated Systems Civil Works, Cables & Security Works 14,658,876.00
24 Advanced Integrated Systems Construction of Access Road 11kms Fujairah- RAK and Trenching & Decting & Lying of Fiber Optic Cables 350kms at Fujairah & Ras Al Khaima Border Area 14,200,000.00
25 MW-B.G-008-2010 Maintenance of Border Road for the Eastern Sector 10,776,000.00
26 MW-SO-063-2007 Processing (79) Towers System of Electronic Eastern Sector Surveillance and the Number of (5) Towers in Sector West to Lead A Group of Border Guards Jv with Al Sahraa Group 10,738,000.00
27 UAE Armed Forces Maintenance & Removal of Sand for Border Roads 10,528,000.00
28 MW-B.G-009-2010 Maintenance of Border Road for the Southern Sector 9,936,000.00
29 MW-SO-433-2007 Maintenance of the Border Fence From Mount Mt Center for the Hafeet to Virulence and the Beacon to the Center for Frontier Glory 8,160,000.00
30 IMECO/GASCO Supplying of Sub Base 8,000,000.00
31 Zublin Excavation & Desposal Work (Al Ain Hospital) 7,358,187.00
32 UAE Armed Forces Maintenance Range At Alhamraa 5,845,175.00
33 Advanced Integrated Systems Additional Work Fiber Optic Cable & Trenching 7 Ducting Lying Of Fiber & Electrical Cable, Jv with Al Sahraa Group 5,700,000.00
34 G H Q Armed Forces Maintenance Buildings of Caded Training Center- Al Ain 5,000,000.00
35 MW- AF- 240- 2007 Of the Center for Tests and Development of Air Dirt Field (ltr) For the Establishment of a Shooting Electronic 4,286,250.00
36 SCADIA Development Works for Al Bateen Airport Infrastructure 3,993,800.00
37 UAE Armed Forces Sand Removal Works Arroundcamp 3,780,000.00
38 Department of Presidential Affairs Backfilling, Gatch Laying, Remov and Fixing Shade and Fence 3,298,308.00
39 China Petroleum Engineering & Construction Corporation Civil Works in Pipeline Row In Sandy/Dune, Including Excavation, Padding, and Backfilling of Pipeline Trench, and Construction of Berm with Compacted Gatch Material Jv with Al Sahraa Group 2,905,638.00
40 MW-BG-082-2008 Of The Transfer and Installation of Concrete Group of Border Barriers to the Leadership of the Guard 2,000,000.00
41 MW-SO-115-2008 The Establishment and Transfer of Towers Along the Mekherz (The Eastern Road to Border Fleabane Sector and the Western Sector 1,976,500.00
42 GHQ Armed Forces Building Maintenance Works for Girls Technical College 1,500,000.00

en_USEnglish